top of page
Built in 2007, this commercial space was issued a special use permit to operate within an industrial zoned district.
This commercial space built in 2003, deep in the heart of downtown, faced many logistical challenges. Yet, it currently operates as a 6000 SF education facility.
Built in 2010, a mixed-use commercial building with a 2200 SF three bed apartment was constructed.
bottom of page